资源类型

期刊论文 707

会议视频 24

年份

2023 61

2022 67

2021 56

2020 66

2019 53

2018 44

2017 51

2016 31

2015 35

2014 29

2013 27

2012 32

2011 14

2010 25

2009 17

2008 23

2007 21

2006 10

2005 11

2004 18

展开 ︾

关键词

优化 18

智能制造 12

多目标优化 9

优化设计 8

遗传算法 6

农业科学 5

稳健设计 4

不确定性 3

能源 3

一阶分析法 2

三峡工程 2

五品联动 2

仿真 2

仿真优化 2

优化升级 2

信息化 2

关键技术 2

分布式优化 2

可靠性灵敏度 2

展开 ︾

检索范围:

排序: 展示方式:

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

《工程管理前沿(英文)》 2017年 第4卷 第1期   页码 76-83 doi: 10.15302/J-FEM-2017012

摘要: Over the last two decades, construction contractors have been gradually making more investments in construction equipment to meet their needs associated with increasing volumes of construction projects. At present, from an operational perspective, almost all contractors pay more attention to maintaining their equipment fleets in well-sustained workable conditions and having a high accessibility of the necessary equipment pieces. However, such an approach alone is not enough to maintain an efficient and sustainable business. In particular, for large-scale construction companies that operate in multiple sites in the U.S. or overseas, the problem extends to an optimal allocation of available equipment. Given the current state of the construction industry in the U.S., this problem can be solved by geographically locating equipment pieces and then wisely re-allocating them among projects. Identifying equipment pieces geographically is a relatively easy task. The difficulty arises when informed decision-making is required for equipment allocation among job sites. The actual allocation of equipment should be both economically feasible and technologically preferable. To help in informed decision-making, an optimization model is developed as a mixed integer program. This model is formed based on a previously successfully developed decision-support model for construction equipment selection. The proposed model incorporates logical strategies of supply chain management to optimally select construction equipment for any construction site while taking into account the costs, availability, and transportation-related issues as constraints. The model benefits those responsible for informed decision-making for construction equipment selection and allocation. It also benefits the owners of construction companies, owing to its cost-minimization objective.

关键词: Construction equipment     Equipment assignment optimization     Web-based asset management    

Structure optimization for magnetic equipment of permanent magnet retarder

Bingfeng JIAO, Desheng LI, Yunkang SUI, Lezhi YE

《机械工程前沿(英文)》 2010年 第5卷 第4期   页码 442-445 doi: 10.1007/s11465-010-0112-z

摘要: The main purpose of this research is to perform a magnetic analysis on the magnetic equipment of permanent magnet retarder (PMR) and optimize the structure of magnetic equipment with the commercial FEM software ANSYS and its design optimization module. The FEM model is built as an axisymmetric model according to the characteristics of the structure of magnetic equipment. Using this model, the magnetic field distribution and magnetic force are calculated by ANSYS. The mathematical model of structure optimization is also built. The design variables are structural parameters including the dimensions of permanent magnets and magnetic yoke, and the objective function is the magnetic force. The unconstrained optimization model takes the maximum value of magnetic force as the objective. A first-order optimization method is used to determine the optimum design of this problem. The optimization process works entirely with the ANSYS parametric design language (APDL). The design tools are used to understand design space and the behavior of the dependent variables. It is shown that designing a structure with the ANSYS optimization module and its design tools is an effective means to improve the structure.

关键词: optimization     ANSYS     permanent magnet retarder     numerical simulation    

Simulation model based on Monte Carlo method for traffic assignment in local area road network

Yuchuan DU, Yuanjing GENG, Lijun SUN

《结构与土木工程前沿(英文)》 2009年 第3卷 第2期   页码 195-203 doi: 10.1007/s11709-009-0032-3

摘要: For a local area road network, the available traffic data of traveling are the flow volumes in the key intersections, not the complete OD matrix. Considering the circumstance characteristic and the data availability of a local area road network, a new model for traffic assignment based on Monte Carlo simulation of intersection turning movement is provided in this paper. For good stability in temporal sequence, turning ratio is adopted as the important parameter of this model. The formulation for local area road network assignment problems is proposed on the assumption of random turning behavior. The traffic assignment model based on the Monte Carlo method has been used in traffic analysis for an actual urban road network. The results comparing surveying traffic flow data and determining flow data by the previous model verify the applicability and validity of the proposed methodology.

关键词: traffic assignment     local area road network     turning ratio     Monte Carlo method    

基于渐进式蚁群优化的多处理器任务分配 Article

Hamid Reza BOVEIRI

《信息与电子工程前沿(英文)》 2017年 第18卷 第4期   页码 498-510 doi: 10.1631/FITEE.1500394

摘要: 任务调度优化是多处理器环境(如并行和分布式系统)取得良好性能所面临的最重要挑战之一。目前大多数任务调度算法基于列表调度法,该方法的基本思路是,以列表的形式准备一系列待调度的节点,赋予这些节点不同优先级,然后不断去除列表中优先级最高的节点,并将其分配给具有最早开始时间(Earliest start time, EST)的处理器。由此可见,该算法的完成时间主要由两大因素决定:(1)任务分配顺序的选择(次序子问题);(2)选定顺序的任务如何分配给处理器(分配子问题)。已有文献提出了许多解决次序子问题的好办法,但分配子问题少有人涉及。本文研究结果显示:传统的按照最早开始时间分配任务的方法并非最优;基于蚁群优化算法,得到一种新的方法,可以获得高效得多的调度方案。

关键词: 蚁群优化;列表调度;多处理器任务图调度;并行与分布式系统    

客运专线铁路箱梁预制场优化

王治斌,王清明

《中国工程科学》 2009年 第11卷 第1期   页码 67-74

摘要:

结合所承担的铁道部及中铁建总公司科研课题“客运专线铁路简支箱梁梁场工业化研究”的研究成果,及近30个梁场的规划设计实践,对梁场选址、梁场的平面布置及设备配套等梁场建设的3大重要内容进行了全面深入的论述。

关键词: 客运专线     梁场     选址     平面布置     设备配套    

一种新颖的多小区正交频分多址中继网络资源优化分配算法 Article

Ning DU,Fa-sheng LIU

《信息与电子工程前沿(英文)》 2016年 第17卷 第8期   页码 825-833 doi: 10.1631/FITEE.1500294

摘要: 在蜂窝网络中,用户通过各自的基站相互通信,且通常位于不同的小区内。对于用户来说,基站相当于一个解码转发中继节点。除了这种传统的用户之外,我们认为相互之间需要通信的用户还可以位于同一小区内,由此产生小区内通信。在这种情况下,基站可作为双向中继取代传统的解码转发中继,实现信息交换。多小区正交频分多址网络同时包含了这两种类型的用户。其中,资源优化分配是我们的研究重点。特别地,我们联合优化子载波分配、子载波成对和功率分配,从而最大化加权速率。通过拉格朗日对偶分解近似求解在用户功率固定的情况下基站资源的最优化问题。仿真结果表明,本文提出的策略优于现有的策略。

关键词: 双向中继;子载波分配;子载波成对    

基于可靠特征点分配算法的鲁棒性跟踪框架 Article

Rong-feng ZHANG, Ting DENG, Gui-hong WANG, Jing-lun SHI, Quan-sheng GUAN

《信息与电子工程前沿(英文)》 2017年 第18卷 第4期   页码 545-558 doi: 10.1631/FITEE.1601464

摘要: 为克服这些技术困难,本文提出基于小波变换的可靠特征点分配(Reliable point assignment, RPA)算法。

关键词: 局部最大小波系数;可靠特征点分配;目标跟踪;跟踪-学习-检测(TLD);卡尔曼滤波器    

探测高超声速滑翔飞行器的区间二型模糊逻辑雷达任务优先级分配方法 Research Articles

孟繁卿1,田康生2

《信息与电子工程前沿(英文)》 2022年 第23卷 第3期   页码 488-501 doi: 10.1631/FITEE.2000560

摘要: 针对相控阵雷达探测临近空间高超声速滑翔飞行器时的资源管理问题,设计了一种基于区间二型模糊逻辑系统的雷达任务优先级分配方法。详细阐述了雷达任务数学模型、高超声速滑翔目标的运动模型和探测模型。将高超声速滑翔飞行器的目标威胁划分为机动威胁、速度威胁、方位威胁和距离威胁。此方法中,机动因子、速度、方位、距离和初始优先级为输入变量,雷达任务优先级为输出变量。为减少模糊规则数、避免规则爆炸,设计了分层结构的区间二型模糊逻辑系统。最后,通过仿真验证该方法可行性。结果表明,基于区间二型模糊逻辑系统的任务优先级分配方法具有更高的精确跟踪率、平均初始优先级和目标威胁度以及更短的偏移时间。

关键词: 高超声速滑翔飞行器;相控阵雷达;区间二型模糊逻辑系统;优先级分配    

武器装备完好性评价方法研究

俞翔,杜刚,何其伟

《中国工程科学》 2015年 第17卷 第5期   页码 76-82

摘要:

武器装备完好性评价对于装备的精细化、科学化使用管理和维修保障具有重要意义,而目前的评价方法在时效性、精确性以及任务匹配度等方面都与新形势新要求不相适应。针对这一问题,提出了基于设备技术状态的装备完好性评价方法,通过对某型驱逐舰的完好性模拟评价,验证了该方法的可行性,并提出了进一步完善装备完好性评价方法和机制的对策建议。

关键词: 装备完好性;技术状态;装备维修保障;对策建议    

面向高端装备制造业的高端制造装备需求趋势分析

张俊,卢秉恒

《中国工程科学》 2017年 第19卷 第3期   页码 136-141 doi: 10.15302/J-SSCAE-2017.03.019

摘要:

高端制造装备是高端装备制造业快速发展的基础,本文针对航空装备、航天装备、轨道交通装备、海洋工程装备、智能制造装备等高端装备制造业的“十三五”发展趋势,分析了各领域对高端机床和高端基础制造装备提出的新需求和未来的发展重点,并结合我国制造装备行业的现状,提出了几点建议,以促进我国高端装备制造业的良性发展。

关键词: 高端装备制造业     高端制造装备     机床     基础制造装备    

Analyzing sustainability of construction equipment in the state of California

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI, Mohammad MOZAFFARPOUR

《工程管理前沿(英文)》 2017年 第4卷 第2期   页码 138-145 doi: 10.15302/J-FEM-2017013

摘要: Construction equipment encompasses highly polluting machines adversely affecting the environment. Management tools are necessary for sustainability assessment of construction equipment fleets to allow contractors to reduce their emissions and comply with local or federal regulations. In addition to management tools, there is a need for a metrics that will allow companies to accurately assess the sustainability of their construction equipment fleets. The State of California USA is adopting innovative approaches to reduce adverse impact of humans on the environment. Once successfully implemented, the chances are that such practices attract other states to adopt similar approaches. This paper presents an evaluation of construction equipment fleets and data analysis. When measured and recorded, such results can be used along with decision-support tools for selection and utilization of construction equipment. The metrics for construction equipment evaluation as well as the tool for sustainable decision-making are developed based on readily available data from manufacturers or maintenance shops without a need for additional effort by contractors or government agencies for their adoption. The metrics developed and the decision support tool incorporate logical strategies of supply chain management for optimal selection of construction equipment for construction site while taking into account the availability, cost, and mobilization related constraints. The metrics and the model can benefit both the government agencies responsible for inspection of fleets and owners of construction companies in their decision-making processes related to environmental sustainability.

关键词: Construction equipment     greenhouse gas emissions     sustainability index     sustainable construction    

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

《工程管理前沿(英文)》 2020年 第7卷 第1期   页码 1-26 doi: 10.1007/s42524-020-0093-5

摘要: The airline industry is a representative industry with high cost and low profitability. Therefore, airlines should carefully plan their schedules to ensure that overall profit is maximized. We review the literature on airline planning and scheduling and focus on mathematical formulations and solution methodologies. Our research framework is anchored on three major problems in the airline scheduling, namely, fleet assignment, aircraft routing, and crew scheduling. General formulation, widely used solution approaches, and important extensions are presented for each problem and integrated problems. We conclude the review by identifying promising areas for further research.

关键词: airline planning     fleet assignment problem     aircraft routing problem     crew pairing problem     crew rostering problem     crew scheduling problem     integrated planning    

我国海洋油气装备发展战略研究

程兵,付强 ,李清平 ,刘一斌 ,朱琳 ,吴英

《中国工程科学》 2023年 第25卷 第3期   页码 13-21 doi: 10.15302/J-SSCAE-2023.03.002

摘要:

海洋油气装备是开发海洋油气、建设海洋强国的国之重器,近年来中国的海洋油气装备取得了一系列突破,正在实现面向超深水的跨越,但仍然存在一定的不足。本文全面分析和总结了海洋油气勘探装备、钻井装备、施工装备、生产装备的全球发展现状和国内发展水平,分析了我国海洋油气装备领域的发展差距,并提出了各个领域未来的重点发展方向。研究提出了我国海洋油气装备未来的发展目标,并提出了无人化、智能化、标准化发展实现常规海洋装备产业的升级;超前部署3000 米级超深水油气田开发技术和装备体系,制定关键核心装备清单,加快核心装备的突破;加快水下生产装备的国产化应用;加快实现浮式液化天然气设施(FLNG)的突破,打造大国重器;加强海洋装备测试及认证体系建设,助力“首台套”装备的应用;探索海洋油气装备与海上新能源融合发展等战略建议,以期为我国未来的海洋油气装备发展战略提供参考。

关键词: 海洋油气;勘探装备;钻井装备;施工装备;生产装备    

Proposing a “lean and green” framework for equipment cost analysis in construction

Ming LU, Nicolas DIAZ, Monjurul HASAN

《工程管理前沿(英文)》 2019年 第6卷 第3期   页码 384-394 doi: 10.1007/s42524-019-0033-4

摘要: One limitation of previous productivity-driven research on equipment selection and operation simulation lies in the fact that the green aspects of construction activities have been largely neglected in analysis of costefficiency of construction operations. On the other hand, studies attempting to measure greenhouse gas emission due to construction activities have yet to develop a methodology that correlates their findings and implications with construction productivity. In order to address the immediate need for improving the sustainability performance of construction projects, it is imperative for the construction industry to evaluate greenhouse gas emission as a cost factor in construction planning, equipment selection, and cost estimating. In this context, this paper formalizes an integrative framework for equipment cost analysis based on the concepts of lean construction and green construction, aimed to guide the selection of appropriate construction equipment considering exhaust emission and productivity performance at the same time. The framework is elaborated in earthwork construction in order to evaluate the impact of greenhouse gas emission in estimating equipment hourly rates and assessing greenness and sustainability for alternative equipment options.

关键词: green construction     lean construction     equipment     simulation     earthwork construction     sustainability     productivity    

Digital monitoring and health diagnosis for mechanical equipment operation safety based on fiber Bragg

Zude ZHOU, Desheng JIANG, Quan LIU

《机械工程前沿(英文)》 2009年 第4卷 第1期   页码 5-14 doi: 10.1007/s11465-009-0011-3

摘要: This paper introduces fiber Bragg grating (FBG) based on a fiber optic grating sensor developed to be embedded on mechanical equipment for digital monitoring and health diagnosis. The theoretical and experimental researches on the new-style FBG sensor (FBGS) technology, high-speed demodulation, and data transmission are discussed. The transmission characteristics between the FBG and the detection interface, modeling and compensation method for online distributed multi-parameter digital monitoring and methods for data processing, synchronous sampling, and long-term dynamic digital monitoring using embedded technology are also presented. The acquired information by an FBGS can be used for the optimization of maintenance schedules and refinement of mechanical equipment design. It is a challenge to gather real-time data from components working at high speed and in a severe environment of high temperature, high pressure, and high rotation speed. Currently, there are no sensors or technologies available for digital monitoring and health diagnosis under this rigorous situation for use in mechanical engineering operation safety. As a result, this paper introduces an online distributed and integrated digital monitoring system and health diagnosis. The new principle and new method will contribute to modern measurements in science and technology, mechanical engineering, and large mechanical equipment operation safety.

关键词: fiber Bragg grating sensor (FBGS)     mechanical equipment operation safety     embedded technology     high-speed demodulation     digital monitoring     health diagnosis    

标题 作者 时间 类型 操作

Web-based construction equipment fleet management system: cost-effective global and local allocation

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI

期刊论文

Structure optimization for magnetic equipment of permanent magnet retarder

Bingfeng JIAO, Desheng LI, Yunkang SUI, Lezhi YE

期刊论文

Simulation model based on Monte Carlo method for traffic assignment in local area road network

Yuchuan DU, Yuanjing GENG, Lijun SUN

期刊论文

基于渐进式蚁群优化的多处理器任务分配

Hamid Reza BOVEIRI

期刊论文

客运专线铁路箱梁预制场优化

王治斌,王清明

期刊论文

一种新颖的多小区正交频分多址中继网络资源优化分配算法

Ning DU,Fa-sheng LIU

期刊论文

基于可靠特征点分配算法的鲁棒性跟踪框架

Rong-feng ZHANG, Ting DENG, Gui-hong WANG, Jing-lun SHI, Quan-sheng GUAN

期刊论文

探测高超声速滑翔飞行器的区间二型模糊逻辑雷达任务优先级分配方法

孟繁卿1,田康生2

期刊论文

武器装备完好性评价方法研究

俞翔,杜刚,何其伟

期刊论文

面向高端装备制造业的高端制造装备需求趋势分析

张俊,卢秉恒

期刊论文

Analyzing sustainability of construction equipment in the state of California

Hakob AVETISYAN, Miroslaw SKIBNIEWSKI, Mohammad MOZAFFARPOUR

期刊论文

Airline planning and scheduling: Models and solution methodologies

Lei ZHOU, Zhe LIANG, Chun-An CHOU, Wanpracha Art CHAOVALITWONGSE

期刊论文

我国海洋油气装备发展战略研究

程兵,付强 ,李清平 ,刘一斌 ,朱琳 ,吴英

期刊论文

Proposing a “lean and green” framework for equipment cost analysis in construction

Ming LU, Nicolas DIAZ, Monjurul HASAN

期刊论文

Digital monitoring and health diagnosis for mechanical equipment operation safety based on fiber Bragg

Zude ZHOU, Desheng JIANG, Quan LIU

期刊论文